22 juin 2016 - without being limited to, the cost of the labour, materials and services required to complete this work, including the supply of information, tests ...
654KB taille 4 téléchargements 670 vues
Title-Sujet

RETURN BIDS TO:

Restoration of Cap-des-Rosiers Beach and Development of a Multi-purpose Trail

RETOURNER LES SOUMISSIONS À:

Parks Canada National Contracting Services

Solicitation No. - No. de l’invitation

June 22, 2016

Client Ref. No. – No. de réf du client.

5P300-16-5167

1899, boul. De Perigny Chambly, Quebec J3L 4C3

GETS Reference No. – No de reference de SEAG

Solicitation Closes L’invitation prend fin –

AMENDMENT #4 & QUESTIONS/ ANSWERS #3 TO:

at – à 2:00 PM on – le 2016-06-28

Time Zone Fuseau horaire EASTERN DAYLIGHT TIME (EDT)

F.O.B. - F.A.B.

Plant-Usine:  Destination:  Other-Autre:  Address Inquiries to: - Adresser toute demande de renseignements à :

APPEL D’OFFRES INVITATION TO TENDER

Sylvie Lagacé [email protected]

Tender To: Parks Canada Agency We hereby offer to sell to Her Majesty the Queen in right of Canada, in accordance with the terms and conditions set out herein, referred to herein or attached hereto, the goods, services, and construction listed herein and on any attached sheets at the price(s) set out therefor. Soumission à: l’Agence Parcs Canada Nous offrons par la présente de vendre à Sa Majesté la Reine du Chef du Canada, aux conditions énoncées ou incluses par référence dans la présente et aux annexes cijointes, les biens, services et construction énumérés ici et sur toute feuille ci-annexée, au(x) prix indiqué(s).

Date

Telephone No. - No de téléphone

Fax No. – No de FAX:

450 447-4896

450-658-2428

Destination of Goods, Services, and Construction: Destinations des biens, services et construction:

Voir aux présentes

Vendor/Firm Name and Address Raison sociale et adresse du fournisseur/de l’entrepreneur

Comments – Commentaires

Telephone No. - No de telephone: Facsimile No. - N° de télécopieur:

Vendor/Firm Name and Address Raison sociale et adresse du fournisseur/de l’entrepreneur Issuing Office - Bureau de distribution Parks Canada Agency National Contracting Services 1899, boul. De Périgny Chambly, Québec J3L 4C3

Email - Courriel : _________________________________ Name and title of person authorized to sign on behalf of the Vendor/Firm Nom et titre de la personne autorisée à signer au nom du fournisseur/ de l’entrepreneur

Name / Nom

Telephone No. - No de telephone: Facsimile No. - N° de télécopieur:

Signature

Page 1 of 4

Title / Titre

Date

AMENDMENT # 4 THE PURPOSE OF THIS AMENDMENT IS TO INFORM BIDDERS ABOUT MODIFICATIONS MADE TO THE BID DOCUMENTS AND ANSWERED QUESTIONS ASKED BY POTENTIAL BIDDERS. YOU MUST CONSIDERED THESE INFORMATIONS IN YOUR PROPOSAL. Section 01 29 00 – Payment procedures, Article 1.4.7.8 “CG-14 (50 mm) (beach access 1 and 2)” is substituted by the following article: .8

CG-14 (100 mm) (beach access 1 and 2) .1 CG-14 sub-base will be measured and paid per square metre (m2) actually placed. The price includes, without being limited to, the cost of the labour, materials and services required to complete this work, including the supply of information, tests and particle sizes required for the initial approval of the material, the approval of the borrow source, the supply of materials, their transport to the site of the work, the weighting of the materials, their placement, their compaction, as well as any expenses occasioned by this work, as described in the plans and specifications. The placement must include the profiling according to the profiles called for on the plans.

Substitute the bid form attached to Amendment #1 with the one attached to the present Amendment. SEE ATTACHMENT ENCLOSED >.

END OF SECTION.

Page 2 of 4

QUESTIONS/ANSWERS # 3 QUESTION 1: In regard to article 7.1 of the “Surface Grading” form, the profile of NS/infra on H301 – H304 sheets show that the NS elevation is lower than the infra line. It is not specified in the description of the item if we are to add quarry run backfill until the infra elevation is reached. We understand that if the infra line elevation cannot be reached thanks to topsoil excavation/backfill, the gap will be filled with quantities payable per m3, article 7.5 of the bid form. Is this right? ANSWER 1: Yes, that is right. QUESTION 2: In article 7.8 of the form, as well as in the description of the article in section 01 29 00 of the specifications, it is written that CG-14 for the beach access must have a thickness of 50 mm. However, it is written 100 mm on the H306 plan detail. Considering that this item is payable per m 2, it would be important to specify the required thickness. ANSWER 2: The thickness of the CG-14 for the beach access is 100 mm. An addendum will be issued on this matter. QUESTION 3: At point 1.7.4.5 of section 35 31 19 of the specifications, it is specified that every armour stone must be weighed. It is to our understanding that the purpose of the quality plan to be implemented, as well as the reference stones at the embankment dismantling site, was to prevent having to weigh every stone. ANSWER 3: In section 01 29 00 – Payment Procedures, article 1.4.4.6 “Storage, 2.0 – 4.0 t. stones, including sorting and production if required” and article 1.4.4.7 “Storage, 4.5 – 7.5 t., including sorting and production if required”, every stored stone must be weighed and identified with its weight. The purpose of the reference stones, which are permanently in place near the dismantling area, is to facilitate sorting during work. QUESTION 4: In regard to point 1.7 of section 35 31 19, are we to understand that there needs to be one full-time geologist, one full-time supervisor, as well as inspectors, for the quality control of stones, or is the geologist only required if needed? ANSWER 4: The degree to which the engineering geologist is involved must allow for compliance with the specifications requirements. QUESTION 5: Can the former access road (chaining +/- 12+945) which connects the beach to Road 132 be used for our needs during the project? The contract includes the renaturation of the access. ANSWER 5: The granular sub-base of the former access road was removed last year and replaced by topsoil backfill as to allow renaturation work planned in the bid documents. It is not prohibited to use part of the former road’s right-of-way for the development of a temporary road as long as the requirements of the bid documents are complied with. The Contractor must submit his method in his work plan, which must then be approved by the Departmental Representative.

QUESTION 6: The documents specify that we will use a section of the former Road 132 for the storage of stones. Do we have to remove the paving or can it stay in place under the stonefill? ANSWER 6: It is not requested in the bid documents to remove the paving under the former Road 132 used for the storage of stones. QUESTION 7: Sheet H105 of the drawings shows a wooden wall to be demolished. Considering that there is no available information, is it possible to add an item (unit price, m3) for the demolition and disposal of this wall? Is there creosote in the wood? ANSWER 7: The demolition of the wooden wall is included in the beach reprofiling work (reference in section 31 23 11 – Excavation and Fill, article 3.6 “Beach reprofiling” and section 01 29 00 – Payment Procedures, article 1.4.5.1 “Bank reprofiling in accordance with gradients specified on drawing…”. It is impossible to specify if the wood is creosoted. Consider that there is no creosote in the wood. QUESTION 8: Can you confirm if all the reinforcing steel in the footing and bases (cast in place and/or prefabricated) of the various elements must be galvanized? There are no requirements on drawings, but the specifications refer to galvanization a few times. ANSWER 8: Reinforced steel does not need to be galvanized. QUESTION 9: In regard to the electrical and telecommunication cables to be removed, are there concrete pedestals to be demolished or is it only buried cables as shown on plans? If so, is it possible to know the dimensions of these pedestals? ANSWER 9: The electrical and telecommunication cables are simply buried; they are not placed in concrete pedestals. QUESTION 10: Do the dimensions of bike racks have to be exactly the same as those shown on drawings? Otherwise, customized manufacturing could be required, which would increase the bid price. Is an equivalent accepted? ANSWER 10: Bike racks dimensions can be slightly different but must approach dimensions shown on drawings as much as possible.

End of section. THE OPENING DATE HAS BEEN EXTENDED TO TUESDAY, JUNE 28, 2016 – 2 PM (EDT).

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.