Champlain Node Parking Lot

21 déc. 2018 - for the Champlain Node east side, including the parking lot relocation recommended in the Ottawa ..... The shape and overall design is simple.
2MB taille 13 téléchargements 320 vues
Federal Land Use, Design, and Transaction Approval Submission

Public

For

No.

2019-P183

To

Board of Directors

Date 2019-01-24/25

DECISION

Subject/Title Champlain Node Parking Lot Relocation and Landscape Design

Purpose of the Submission •

To obtain approval for the design of the landscape works funded by the 2018 budget for the Champlain Node east side, including the parking lot relocation recommended in the Ottawa River South Shore Riverfront Park Plan.

Recommendations •

THAT the Federal Land Use and Design Approval for the landscape works funded by the 2018 budget for the Champlain Node east side be granted, and;



THAT the preparation and signature of the Federal Land Use and Design Approval document for the landscape works funded by the 2018 budget for the Champlain Node east side be delegated to the Executive Director, Capital Planning Branch.

Submitted by: Daniel Champagne, Executive Director, Capital Planning Branch____ Name _______________________________________________________ Signature

Submission:

2019–P183

Page 1 of 4

Federal Land Use, Design, and Transaction Approval Submission

Public

1. Authority •

National Capital Act, section 12.

2. Project Description The need for the proposed works has resulted from the following: •





The Ottawa River South Shore Riverfront Park Plan includes a demonstration plan for multiple improvements at the Champlain Node on both sides of Island Park Drive. These include shoreline pathway segregation and improved connectivity; parking lot relocation; flood protection; animation/place-making; shoreline attractions; habitat improvements; and view enhancement. Flooding in May 2017 resulted in damage including a sink hole in the existing parking lot where a drainage channel collapsed on the east half of the node. The hole is fenced and a section of the parking lot is not accessible to the public. The need for action prioritized this site for remediation. The 2018 budget fund presents an opportunity to implement not only the flood damage repairs, but also many aspects of the long-term plan for this site related to flood mitigation, most notably the relocation and raising of the parking lot.

As a result of this alignment of challenges and opportunities, the eastern side of the Champlain Node will be the first of the Riverfront Park Plan improvements to be implemented. To ensure that the 2018 budget works respect the long-term vision for this node and the whole Riverfront Park, the project team prepared: • •

A site plan of all the improvements identified in the Riverfront Park Plan; and A detailed design plan of the 2018 budget funded improvements including the parking lot relocation and raising.

Both plans were presented to ACPDR in October 2018. The 2018 budget works are expected to begin construction in 2019 and be completed in 2020. Detailed design and implementation of the other works shown in the site plan will be phased over time, as budgets become available, with next priority on the shoreline works (pathway relocation and segregation, new look-outs, improved shoreline habitat, etc.) followed by the new pathway connection and service node on the west side of the site plan. Key features of the 2018 budget works are as follows: • •



Demolish the existing 65 car parking lot and reinstate the area with lawn. Relocate a new 65 car parking lot to just north of Sir John A. Macdonald (SJAM) Parkway and raise it to the 100-year flood level, and construct a new bus loop and drop-off for 2 buses. The parking and bus loop will both be accessed from the existing driveway except that buses will exit via a new bus exit driveway. Add vegetative screening between the parking lot and the SJAM Parkway.

Submission:

2019–P183

Page 2 of 4

Federal Land Use, Design, and Transaction Approval Submission

Public

• • •

Create a new pathway from the parking lot and bus drop-off to the existing shoreline pathway in its current location and elevation. Reinstate the sinkhole and replace the collapsed drainage inlet with a new concrete box culvert. Create a new bioswale north of the parking lot for stormwater treatment.

Additional features of the site plan to be implemented in subsequent phases: • • • • • •

Segregate the pathway into a 3m wide cycling lane and 2m wide pedestrian path. Relocate the pathway further from the river to allow vegetation and habitat enhancements, erosion protection as well as new viewpoints/rest areas between the path and the shoreline. Add a service node for seasonal toilets and portable food services, raised to the 20 year flood level. Add a new segregated pathway connection to the shoreline pathway from the intersection of Island Park Drive and SJAM Parkway. The section of this pathway between the parking lot and the service node can be used by delivery vehicles. Create a central lawn area for passive use and events which may occasionally be covered in floodwater. It will be surrounded by meadow planting for habitat enhancement. Create views areas along the shoreline and screen views along most of the adjacent parkways.

3. NCC Staff Analysis / Risks and Mitigations Measures •



In accordance with the advice of the Rideau Valley Conservation Authority (RVCA) for working within the 100 year floodplain, risks were mitigated by early and frequent consultation with them. Submission of the required analysis led to an exemption from the cut-fill balance requirement and no further mitigation is required. Environmental studies are also complete and no significant concerns have been raised that cannot be mitigated through commonly used approaches.

4. Strategic Links • • •

NCC Corporate Priority 3: Offer public access and new connections for Canadians to discover the shorelines and waterways. NCC Plan for Canada’s Capital (2017-2067) NCC Ottawa River South Shore Riverfront Park Plan

5. Consultations and Communications • •

RVCA consultations began in April and continued throughout the design process; NCC Capital Stewardship and Capital Planning staff review throughout the design process;

Submission:

2019–P183

Page 3 of 4

Federal Land Use, Design, and Transaction Approval Submission

Public

• • • •

Public information signage posted at the sinkhole fencing highlighting reasons for the closure of that section of the parking lot and the NCC’s plans to redesign the site; Notification to community and interest groups prior to starting transplanting of 20 trees and cutting 9 trees that are too large to transplant. Public Affairs prepared a strategy to ensure the public and stakeholders are engaged. ACPDR presentation on October 4, 2018 (please refer to Appendix C).

6. Next Steps • • •

Completion of tender documents in February 2019; Continue informing the public and stakeholders and implement the public engagement plan; Start implementation through the Construction Management contract in late spring 2019.

7. List of Appendices Appendix A – Site Plan Appendix B – Detailed Design Plan Appendix C – Excerpt of the minutes of the ACPDR meeting of October 4, 2018

8. Authors of the Submission Daniel Champagne, Executive Director, Capital Planning Branch (CP) Pierre Vaillancourt, Director, Design and Construction, CP Stan Leinwand, Acting Director, Federal Approvals & Heritage, CP Yoland Charette, Chief, Landscape Architecture and Industrial Design, CP Justin Nadeau, Project Manager, Design and Construction, CP Susan Fisher, Senior Landscape Architect, Design and Construction, CP Jason Hutchison, Principal Landscape Architect, Federal Approvals & Heritage, CP

Submission:

2019–P183

Page 4 of 4

Phase 2

Phase 1

Phase 3

STORM WATER SEWER REPLACEMENT AND SINKHOLE REINSTATEMENT

EXISTING MULTI-USE ASPHALT PATHWAY STRM STRM STRM

STRM STRM

STRM

STRM STRM

STRM

STRM STRM

STRM

E

E E

E E

STRM RM ST

E E

E E

STRM STRM

E

E E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E E E E

E

E E

W

E

E E

E

E

E

E

E

E

STRM

E

W

M R ST

RM

E

E

RM

ST

W

E M

R

E

ST

E

W

VEGETATIVE SCREENING

E E

RM

STRM

RM ST

E

STRM

E

W

E RM ST

EXISTING PARKING LOT TO BE REMOVED AND REPLACED WITH LAWN

ST

STRM

W

RM ST STRM

E

STRM

E

M RM TR S ST RM ST

ENTRANCE FOR CARS AND BUSES, EXIT FOR CARS AT SAME LOCATION AS EXISTING

E

E

E

E

STRM

E

E

E

E

E

E

STRM

E

E

E

E

RM ST

E

E

E

RM ST STRM

STRM

W

E

E

RM ST STRM

E E

E

RM ST STRM

E E

E

STRM STRM

E

E E

E

STRM STRM

E E

E

STRM

E

E

STRM STRM

STRM STRM

STRM STRME

E STRM STRM

STRM

W

E

E

E

E E

E

STRM

W

E E

STRM

W

STRM RM ST

STRM STRM

STRM STRM

STRM STRM

E

E

E

E

ST

ST RM ST

RM

E

W

E

RM

STRM

ST

RM

E

W

ST

BUS LOOP

STRM

M R ST

STRM

E

ASPHALT INTERIM PATH, 2m WIDE LINKS NEW PARKING TO EXISTING MULTI-USE PATH

M R ST

RM

ST

W

E

STRM

ST

RM

E

M R ST W

ST RM

RM ST STRM

STRM

STRM

STRM

STRM

STRM

STRM

W

RM ST

E

ST RM

ASPHALT WALKWAY, 2m WIDE FOR BUS DROP-OFF

STRM

W

E

E

CB

E

W

BUS LAY-BY AREA

ST RM

RM ST

E

W

RM ST

E

E RM ST

E

W

RM ST

E

W

RM ST

E

W

E

RM ST

E

W

RM ST

E

W

RM

ST

E

E

W

RM ST

E

E W

RM ST

G

W

RM ST

ISLA

R E E

W

RM ST

W

RM ST

E

E

ND P

EXIT FOR BUSES ONLY

RM

W

ST

E

E

W

E

E

W

RM ST

E

W

RM ST

E

DRIV

RM ST

ARK

PLANTED BIOSWALE 3M WIDE ASPHALT WALKWAY

E RM ST

W

ST

E

RM W

RM ST

E

W

ST

E

RM

VEGETATIVE SCREENING

W

Y

RM ST RM

ST

W

WA

E

W

E E

W

RM

ST

E

W

RM ST

E

NAL

W

RM

ST

E

DP

E

CDO

RM ST

ARK

E

P WOOD BRIDGE ACROSS BIOSWALE AND MARKING ON ASPHALT TO DISTINGUISH ACCESS TO BRIDGE ACROSS SWALE

E

E

ST RM

. MA

W

RM ST

E

E W

E

JOH

E

ST RM

W

RM ST

E

SIR

E

ST RM

W

RM ST

E

E

W

ST RM ST

P

ST

RM

RM

W

E

E

ST

E

E

W

RM

RM ST

NA

W

RM ST

E

ST RM

RM ST RM ST

ST RM W

ST

RM

E

RM ST

PROPOSED PARKING 67 STALLS, INCLUDING 3 UA STALLS ASPHALT WITH CONCRETE CURB

E

E

RM ST

W

ST

E

RM

RM

ST

E

LEGEND

W

ST RM

E

RM ST

E

W

RM ST

ST RM

E W

RM

ST

E

ST RM

LAWN REINSTATEMENT

E

E

ST RM

RM ST

ST

GROUNDCOVERS / SHRUBS

G E

W

ST RM

E

W

TURN AROUND AREA

ST

E

RM

W

ST RM

E

P

ST

CONIFEROUS TREE - PROPOSED

PLANTED BIOSWALE

E

E RM ST

DECIDUOUS TREE - PROPOSED

E

W

ST RM

DECIDUOUS TREE - EXISTING

E

E

RM

RM ST

RM

ST

W

RM

W

E ST

E

E

W

ST RM

E

RM

E

ST RM

STR M W

E

CONIFEROUS TREE - EXISTING

E

ST RM

E

C:\Users\vporter\Desktop\181210_P101_50% CD\P101.dwg

E

E ST RM

STR

M E

STR

W

ST

RM

E

M

E

ST RM

STR M E

W

E

STR

M

E

E

W

STR

M

RM

ST

E

E W

RM ST

E

ST RM

W

ST RM

E

RM

ST

E

E

ST RM

E

ST RM

E

Champlain Node Phase 1 100% Detailed Design Plan

E ST

RM

E

E E

RM

W

ST

E

E

ST RM

E

RM

E

E

E

W

ST

E

E

E

E

E E

E

E

E

E

E

W

RM

ST

E

E

E

E

E

E

E

E

December-21-18 11:03:54 AM

RM ST

E

M

R

ST M R ST

RM ST RM ST M

TR

National Capital Commission - Commission de la capitale nationale

1223 rue des Carrières, Studio A, Montréal Québec, Canada, H2S 2B1 t. 514.849.8262 f. 514.279.8040 [email protected]

Protected A

Protégé A

Excerpt of the Minutes of the

Extrait du procès-verbal du

Advisory Committee on Planning, Design and Realty

Comité consultatif de l’urbanisme, du design et de l’immobilier

Meeting of October 4 and 5, 2018

Séance des 4 et 5 octobre 2018

2018-P183 - Champlain Node Site Plan and Parking Lot Relocation Design (C)

2018-P183 - Plan d’implantation du pôle Champlain et conception du nouveau parc de stationnement (C)

Members received a presentation on the Champlain Node site plan and parking lot relocation design. They made the following comments :

Les membres assistent à une présentation sur le plan d’implantation du pôle Champlain et la conception du nouveau parc de stationnement. Ils offrent les commentaires suivants :

Site Plan

Plan du site

 The node should be planned considering the Ottawa River South Shore Riverfront Park Plan.

 Le pôle doit être planifié dans le contexte du Plan du parc riverain de la berge sud de la rivière des Outaouais.

 Members commended the relocation of the parking from the edge of the river, and the use of bioswales.

 Les membres se réjouissent du déplacement du stationnement du bord de la rivière, et de l’utilisation de rigoles de drainage.

 The shape and overall design is simple and elegant.

 La forme circulaire et l’ensemble de la conception sont simples et élégants.

 A winter strategy should be examined, including all-season facilities in the service node.

 On devrait envisager une stratégie pour l’hiver, y compris des installations quatresaisons dans le pôle de services.

 The service node facilities should be designed to be flood resilient.

 Les installations du pôle de services doivent être conçues pour être résistantes aux inondations.

 The seasonal flooding that will occur in the central grassed area could be celebrated by articulating the frequently flooded area in the design.

 On pourrait célébrer les crues saisonnières qui vont arriver dans la pelouse centrale en intégrant la zone de crues fréquentes dans la conception.

 Public art or minor commemoration should

 De

ACPDR / CCUDI

1/3

l’art

public

ou

des

monuments 2018-10-04/05

Protected A

Protégé A

2018-P183 - Plan d’implantation du pôle Champlain et conception du nouveau parc de stationnement (C)

2018-P183 - Champlain Node Site Plan and Parking Lot Relocation Design (C)

be integrated in the site.

commémoratifs de moindre importance devraient être intégrés au site.

 Picnic amenities and shelter should be considered, as well as food services.

 On devrait envisager des aménagements et des abris pour le pique-nique, ainsi que des services d’alimentation.

 Consultation with First narratives is encouraged.

 Les consultations avec Les Premières nations vis-à-vis des textes explicatifs.

Nations

for

Phasing

Mise en phase

 Some members suggested that the pathways should be phased before the parking. The number of parking spaces should be re-examined once the bus loop and the pathways are finished.

 Certains membres suggèrent que les sentiers passent avant le stationnement lors de la mise en phase. On devrait réévaluer la nécessité du stationnement une fois que la boucle pour les autobus et les sentiers sont terminés.

 Others agreed that in the first phase, parking capacity should be similar to current conditions, as it is in high demand to access the pathway.

 D’autres conviennent que lors de la première phase, le nombre de places de stationnement devrait rester le même, puisqu’elles sont en forte demande pour accéder aux sentiers.

 Funding for the next phase could come from parking revenue.

 Le financement de la prochaine phase pourrait venir du revenu du stationnement.

Parking

Stationnement

 The parking should not be a commuter parking lot. Charging a fee for weekday, daytime use will discourage commuters from using it and reduce the need for additional spots.

 Le stationnement ne devrait pas servir pour les migrants journaliers. L’imposition de frais va décourager les gens de l’utiliser et réduire la nécessité de places additionnelles.

 The parking should be both aesthetic and safe. The design should be adjusted to ensure that people and cars can manoeuver safely.

 Le stationnement devrait être esthétique et sûr. On devrait ajuster la conception pour permettre aux gens et aux véhicules de manœuvrer en toute sécurité.

 There should be a way for cars to leave without backing up if there is no spot available. Solar-powered parking management signage could help resolve circulation issues.

 Il devrait y avoir un moyen pour que les autos quittent le stationnement sans reculer s’il n’y a pas de place. Une signalisation de gestion de stationnement fonctionnant à l’énergie solaire réglerait les problèmes de circulation.

 The parking lot should be structured to appear less prominent. One member suggested using grass pavers.

 Le stationnement devrait être structuré pour paraître moins important. Un membre suggère d’utiliser des pavés gazonnés.

 Alternatives to colored asphalt should be considered due to high cost and repair

 On devrait envisager des alternatives à l’asphalte de couleur en raison du coût

ACPDR / CCUDI

2/3

2018-10-04/05

Protected A

Protégé A

2018-P183 - Plan d’implantation du pôle Champlain et conception du nouveau parc de stationnement (C)

2018-P183 - Champlain Node Site Plan and Parking Lot Relocation Design (C)

challenges matching.

associated

with

colour

élevé et des défis liés à la réparation et à la reproduction des couleurs.

Committee Secretary

ACPDR / CCUDI

Secrétaire des comités

3/3

2018-10-04/05